<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Completed Project Archives - Metro South Community Improvement District</title>
	<atom:link href="https://www.metrosouthcid.org/category/completed-project/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.metrosouthcid.org/category/completed-project/</link>
	<description></description>
	<lastBuildDate>Tue, 09 Dec 2025 18:48:59 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1</generator>

<image>
	<url>https://www.metrosouthcid.org/wp-content/uploads/2025/12/cropped-annual-report-mscid-2021-scaled-1.jpg</url>
	<title>Completed Project Archives - Metro South Community Improvement District</title>
	<link>https://www.metrosouthcid.org/category/completed-project/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Lancaster and Old McDonough Tire Removal</title>
		<link>https://www.metrosouthcid.org/tire-removal-2/</link>
					<comments>https://www.metrosouthcid.org/tire-removal-2/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 19 Aug 2022 04:28:42 +0000</pubDate>
				<category><![CDATA[Beautification]]></category>
		<category><![CDATA[Completed Project]]></category>
		<guid isPermaLink="false">http://www.metrosouthcid.org/staging/?p=223</guid>

					<description><![CDATA[<p>BackgroundThe CID puts in extensive effort to collect and recycle illegally dumped tires in the area. In September 2019, the CID collected more than 150 tires and donated them to DeKalb County for recycling. The CID and Keep DeKalb Beautiful removed 1,100 tires along Lancaster and Old McDonough Roads, which is equivalent to almost 12,000 [&#8230;]</p>
<p>The post <a href="https://www.metrosouthcid.org/tire-removal-2/">Lancaster and Old McDonough Tire Removal</a> appeared first on <a href="https://www.metrosouthcid.org">Metro South Community Improvement District</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph"><strong>Background</strong><br>The CID puts in extensive effort to collect and recycle illegally dumped tires in the area. In September 2019, the CID collected more than 150 tires and donated them to DeKalb County for recycling.</p>



<p class="wp-block-paragraph">The CID and Keep DeKalb Beautiful removed 1,100 tires along Lancaster and Old McDonough Roads, which is equivalent to almost 12,000 pounds &#8211; or two African forest elephants weighing 6,000 pounds each!</p>



<p class="wp-block-paragraph">MSCID is continuing the tire cleanup effort until the issue is resolved.</p>



<figure class="wp-block-image size-large is-resized"><img fetchpriority="high" decoding="async" width="768" height="1024" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Tire-and-trash-clean-up-768x1024.jpeg" alt="" class="wp-image-387" style="width:470px;height:auto" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Tire-and-trash-clean-up-768x1024.jpeg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Tire-and-trash-clean-up-225x300.jpeg 225w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Tire-and-trash-clean-up-1152x1536.jpeg 1152w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Tire-and-trash-clean-up-1536x2048.jpeg 1536w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Tire-and-trash-clean-up-scaled.jpeg 1920w" sizes="(max-width: 768px) 100vw, 768px" /></figure>



<p class="wp-block-paragraph"><strong>Completed</strong><br>Lancaster Road tire removal<br>Old McDonough Road tire removal</p>
<p>The post <a href="https://www.metrosouthcid.org/tire-removal-2/">Lancaster and Old McDonough Tire Removal</a> appeared first on <a href="https://www.metrosouthcid.org">Metro South Community Improvement District</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.metrosouthcid.org/tire-removal-2/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Landscaping/Beautification</title>
		<link>https://www.metrosouthcid.org/landscaping-beautification-2/</link>
					<comments>https://www.metrosouthcid.org/landscaping-beautification-2/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 19 Aug 2022 04:27:57 +0000</pubDate>
				<category><![CDATA[Beautification]]></category>
		<category><![CDATA[Completed Project]]></category>
		<guid isPermaLink="false">http://www.metrosouthcid.org/staging/?p=221</guid>

					<description><![CDATA[<p>BackgroundMetro South CID continually works to keep the district in top-notch shape. This includes ongoing maintenance as well as special projects for areas with specific needs. TimelineMoreland Avenue Median Cleanup: Complete</p>
<p>The post <a href="https://www.metrosouthcid.org/landscaping-beautification-2/">Landscaping/Beautification</a> appeared first on <a href="https://www.metrosouthcid.org">Metro South Community Improvement District</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph"><strong>Background</strong><br>Metro South CID continually works to keep the district in top-notch shape. This includes ongoing maintenance as well as special projects for areas with specific needs.</p>



<p class="wp-block-paragraph"><strong>Timeline</strong><br>Moreland Avenue Median Cleanup: Complete</p>



<figure class="wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex">
<figure class="wp-block-image size-large"><img decoding="async" width="1024" height="768" data-id="410" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland1-1024x768.jpg" alt="" class="wp-image-410" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland1-1024x768.jpg 1024w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland1-300x225.jpg 300w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland1-768x576.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland1-1536x1152.jpg 1536w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland1-2048x1536.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img decoding="async" width="768" height="1024" data-id="411" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland2-768x1024.jpg" alt="" class="wp-image-411" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland2-768x1024.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland2-225x300.jpg 225w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland2.jpg 828w" sizes="(max-width: 768px) 100vw, 768px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="768" height="1024" data-id="412" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland3-768x1024.jpg" alt="" class="wp-image-412" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland3-768x1024.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland3-225x300.jpg 225w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland3-1152x1536.jpg 1152w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland3-1536x2048.jpg 1536w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland3-scaled.jpg 1920w" sizes="auto, (max-width: 768px) 100vw, 768px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="768" height="1024" data-id="413" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland4-768x1024.jpg" alt="" class="wp-image-413" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland4-768x1024.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland4-225x300.jpg 225w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland4-1152x1536.jpg 1152w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland4-1536x2048.jpg 1536w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland4-scaled.jpg 1920w" sizes="auto, (max-width: 768px) 100vw, 768px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="768" data-id="414" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland5-1024x768.jpg" alt="" class="wp-image-414" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland5-1024x768.jpg 1024w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland5-300x225.jpg 300w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland5-768x576.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland5-1536x1152.jpg 1536w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland5-2048x1536.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="768" data-id="416" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland6-1024x768.jpg" alt="" class="wp-image-416" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland6-1024x768.jpg 1024w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland6-300x225.jpg 300w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland6-768x576.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland6-1536x1152.jpg 1536w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland6-2048x1536.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="768" data-id="417" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland7-1024x768.jpg" alt="" class="wp-image-417" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland7-1024x768.jpg 1024w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland7-300x225.jpg 300w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland7-768x576.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland7-1536x1152.jpg 1536w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland7-2048x1536.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="768" height="1024" data-id="418" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland8-768x1024.jpg" alt="" class="wp-image-418" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland8-768x1024.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland8-225x300.jpg 225w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland8-1152x1536.jpg 1152w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland8-1536x2048.jpg 1536w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland8-scaled.jpg 1920w" sizes="auto, (max-width: 768px) 100vw, 768px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="768" data-id="419" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland9-1024x768.jpg" alt="" class="wp-image-419" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland9-1024x768.jpg 1024w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland9-300x225.jpg 300w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland9-768x576.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland9-1536x1152.jpg 1536w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Beautification-moreland9-2048x1536.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure>
</figure>
<p>The post <a href="https://www.metrosouthcid.org/landscaping-beautification-2/">Landscaping/Beautification</a> appeared first on <a href="https://www.metrosouthcid.org">Metro South Community Improvement District</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.metrosouthcid.org/landscaping-beautification-2/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Repaving and Resurfacing</title>
		<link>https://www.metrosouthcid.org/repaving-and-resurfacing-2/</link>
					<comments>https://www.metrosouthcid.org/repaving-and-resurfacing-2/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 19 Aug 2022 04:27:30 +0000</pubDate>
				<category><![CDATA[Beautification]]></category>
		<category><![CDATA[Completed Project]]></category>
		<guid isPermaLink="false">http://www.metrosouthcid.org/staging/?p=219</guid>

					<description><![CDATA[<p>MSCID works to resurface and repave roadways within the district. The following projects have been completed: Resurfacing:McDonough Road Continental Way from Bouldercrest Road to International Park Drive. Continental Way is 3,300 ft. in length and International is 1,100 ft.  </p>
<p>The post <a href="https://www.metrosouthcid.org/repaving-and-resurfacing-2/">Repaving and Resurfacing</a> appeared first on <a href="https://www.metrosouthcid.org">Metro South Community Improvement District</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="thrv_wrapper tve_wp_shortcode">
<div class="tve_shortcode_raw" style="display: none"></div>
<div class="tve_shortcode_rendered">
<p class="wp-block-paragraph">MSCID works to resurface and repave roadways within the district. The following projects have been completed:</p>
</p>
<p class="wp-block-paragraph">
</p>
<p class="wp-block-paragraph"><strong><span style="text-decoration: underline;">Resurfacing:</span></strong><br />McDonough Road</p>
</p>
<p class="wp-block-paragraph">Continental Way from Bouldercrest Road to International Park Drive. Continental Way is 3,300 ft. in length and International is 1,100 ft.</p>
</p>
<figure class="wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-3 is-layout-flex wp-block-gallery-is-layout-flex">
<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="640" height="480" data-id="370" class="wp-image-370" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Infrastructure-Road-Paving-1.jpg" alt="" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Infrastructure-Road-Paving-1.jpg 640w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Infrastructure-Road-Paving-1-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" /></figure>
</p>
<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="640" height="480" data-id="396" class="wp-image-396" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Infrastructure-Road-Paving-2.jpg" alt="" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Infrastructure-Road-Paving-2.jpg 640w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Infrastructure-Road-Paving-2-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" /></figure>
</p>
<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="640" height="480" data-id="397" class="wp-image-397" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Infrastructure-Road-Paving-3-1.jpg" alt="" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Infrastructure-Road-Paving-3-1.jpg 640w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Infrastructure-Road-Paving-3-1-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" /></figure>
</p>
<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="640" height="480" data-id="398" class="wp-image-398" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Infrastructure-Road-Paving-3.jpg" alt="" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Infrastructure-Road-Paving-3.jpg 640w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Infrastructure-Road-Paving-3-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" /></figure>
</p>
</figure>
</p>
<p class="has-luminous-vivid-amber-background-color has-background wp-block-paragraph"> </p>
</p>
</div>
</div>
<div class="tcb_flag" style="display: none"></div>
<p>The post <a href="https://www.metrosouthcid.org/repaving-and-resurfacing-2/">Repaving and Resurfacing</a> appeared first on <a href="https://www.metrosouthcid.org">Metro South Community Improvement District</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.metrosouthcid.org/repaving-and-resurfacing-2/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>MSCID Freight Cluster Plan</title>
		<link>https://www.metrosouthcid.org/mscid-freight-cluster-plan/</link>
					<comments>https://www.metrosouthcid.org/mscid-freight-cluster-plan/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 19 Aug 2022 04:09:37 +0000</pubDate>
				<category><![CDATA[Completed Project]]></category>
		<category><![CDATA[Infrastructure]]></category>
		<guid isPermaLink="false">http://www.metrosouthcid.org/staging/?p=197</guid>

					<description><![CDATA[<p>Background The MSCID Freight Cluster Plan (FCP) is being carried out as a part of the Atlanta Regional Commission (ARC) Freight Cluster Plan program. ARC’s program focuses on facilitating efficient freight movement, improving access to jobs, reducing traffic congestion, addressing changes in the freight industry, and improving safety, mobility and access for all roadway users. [&#8230;]</p>
<p>The post <a href="https://www.metrosouthcid.org/mscid-freight-cluster-plan/">MSCID Freight Cluster Plan</a> appeared first on <a href="https://www.metrosouthcid.org">Metro South Community Improvement District</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph"></p>



<p class="wp-block-paragraph"><strong>Background</strong></p>



<p class="wp-block-paragraph">The MSCID Freight Cluster Plan (FCP) is being carried out as a part of the Atlanta Regional Commission (ARC) Freight Cluster Plan program. ARC’s program focuses on facilitating efficient freight movement, improving access to jobs, reducing traffic congestion, addressing changes in the freight industry, and improving safety, mobility and access for all roadway users.</p>



<p class="wp-block-paragraph">The study area includes the MSCID boundary and major truck corridors that feed into and out of the MSCID limits. Also included are freight distribution and warehousing areas that are within a half-mile radius of MSCID’s boundaries, as shown below. This area, nicknamed “Truckers Alley”, is a major access point for industrial trucks entering into and leaving the MSCID.&nbsp;</p>



<figure class="wp-block-image size-full is-resized"><a href="https://www.metrosouthcid.org/wp-content/uploads/2021/03/area-covered.png" target="_blank" rel=" noreferrer noopener"><img loading="lazy" decoding="async" width="1829" height="2367" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/area-covered.png" alt="" class="wp-image-383" style="width:436px;height:auto" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/area-covered.png 1829w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/area-covered-232x300.png 232w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/area-covered-791x1024.png 791w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/area-covered-768x994.png 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/area-covered-1187x1536.png 1187w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/area-covered-1583x2048.png 1583w" sizes="auto, (max-width: 1829px) 100vw, 1829px" /></a></figure>



<p class="wp-block-paragraph"><a href="https://www.metrosouthcid.org/wp-content/uploads/2021/03/area-covered.png">Click the image</a>&nbsp;to enlarge.</p>



<figure class="wp-block-image size-full"><img loading="lazy" decoding="async" width="2000" height="1125" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Area-Overview.jpg" alt="" class="wp-image-374" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Area-Overview.jpg 2000w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Area-Overview-300x169.jpg 300w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Area-Overview-1024x576.jpg 1024w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Area-Overview-768x432.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Area-Overview-1536x864.jpg 1536w" sizes="auto, (max-width: 2000px) 100vw, 2000px" /></figure>



<p class="wp-block-paragraph"></p>



<h4 class="wp-block-heading"><strong>The MSCID Freight Cluster Plan will specifically accomplish the following:</strong></h4>



<ul class="wp-block-list">
<li>Identify and program transportation improvements specific to freight</li>



<li>Promote efficient transportation solutions</li>



<li>Identify land uses and target industries that support compatible future growth and development</li>



<li>Engage the private sector and surrounding community</li>



<li>Promote economic development</li>
</ul>



<figure class="wp-block-gallery has-nested-images columns-1 is-cropped wp-block-gallery-4 is-layout-flex wp-block-gallery-is-layout-flex">
<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="576" data-id="375" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-1-1024x576.jpg" alt="" class="wp-image-375" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-1-1024x576.jpg 1024w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-1-300x169.jpg 300w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-1-768x432.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-1-1536x864.jpg 1536w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-1.jpg 2000w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="576" data-id="376" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-2-1024x576.jpg" alt="" class="wp-image-376" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-2-1024x576.jpg 1024w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-2-300x169.jpg 300w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-2-768x432.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-2-1536x864.jpg 1536w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-2.jpg 2000w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="576" data-id="377" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-3-1024x576.jpg" alt="" class="wp-image-377" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-3-1024x576.jpg 1024w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-3-300x169.jpg 300w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-3-768x432.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-3-1536x864.jpg 1536w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cedar-Grove-Bridge-Challenge-3.jpg 2000w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="576" data-id="378" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cluster-Plan-Advantages-1024x576.jpg" alt="" class="wp-image-378" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cluster-Plan-Advantages-1024x576.jpg 1024w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cluster-Plan-Advantages-300x169.jpg 300w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cluster-Plan-Advantages-768x432.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cluster-Plan-Advantages-1536x864.jpg 1536w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/MSCID-FCP_ARC-Freight-Presentation-Cluster-Plan-Advantages-2048x1152.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure>
</figure>



<p class="wp-block-paragraph">See the June 2022 report&nbsp;<a href="https://www.dropbox.com/scl/fi/vfhswor2qkeyzmb41l13s/MSCID-FCP_FATF-06-02-2022-ARC-presentation.pptx?dl=0&amp;oref=e&amp;r=ABuhElw3cZwlvq65VFegfJg66yLz4FJ3K4tVNQS68WdP4NO_X2R674pA5ss4sDB85T5zzD6nqkvW1LMLjdrF1i20toOHRn5Ad4tPd1W3On1DcjcSrM3Zoq3rXa688PGw-OTP7MHUZlXuAu-9CJa25WEnk-Fe8QtDuFppBs3u0J6d-ME1HV4SXj2G_fqjfELHmzE&amp;sm=1">here</a>.&nbsp;</p>



<p class="has-vivid-red-color has-text-color has-link-color wp-elements-2 wp-block-paragraph"><strong>***This link above is restricted access.</strong></p>



<p class="has-luminous-vivid-amber-background-color has-background wp-block-paragraph">[This is a link to the presentation Larry presented on June 2, 2022. We may be able to use the table on Page 4 showing the status of all deliverables in the copy here or at the beginning as the Current Status at the start.]</p>



<p class="wp-block-paragraph"><a href="https://www.metrosouthcid.org/wp-content/uploads/2021/11/2021.10.12-mscid-fcp-best-practices-report_final.pdf">Best Practices Report 2021</a></p>



<p class="wp-block-paragraph"><a href="https://www.metrosouthcid.org/wp-content/uploads/2021/03/2021.03.18-mscid-fcp-approved-project-management-plan.pdf">MSCID Freight Cluster Plan – Project Management Plan</a></p>



<p class="wp-block-paragraph"><strong>Funding</strong><br>This Freight Cluster Plan was 80% funded with Federal monies administered by the ARC and paid to the MSCID for managing the plan. The MSCID provided local matching funds for the remaining 20%.</p>



<p class="wp-block-paragraph"><strong>Timeline</strong><br>The Plan&nbsp;is scheduled for adoption by the MSCID in March 2022&nbsp;followed up by adoption by the DeKalb County. Please see the project schedule for the tentative planning timeline.</p>



<p class="wp-block-paragraph">MSCID has had various forums to engage MSCID members, area freight stakeholders, and the broader community in and around the study area in July and November 2021. The public forums were informational and provided attendees with the opportunity to ask questions and obtain feedback from the study team.&nbsp;</p>



<figure class="wp-block-image size-full"><img loading="lazy" decoding="async" width="1200" height="617" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Freight-Cluster-Plan-Schedule-Graphic_v2.jpg" alt="" class="wp-image-384" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Freight-Cluster-Plan-Schedule-Graphic_v2.jpg 1200w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Freight-Cluster-Plan-Schedule-Graphic_v2-300x154.jpg 300w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Freight-Cluster-Plan-Schedule-Graphic_v2-1024x527.jpg 1024w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Freight-Cluster-Plan-Schedule-Graphic_v2-768x395.jpg 768w" sizes="auto, (max-width: 1200px) 100vw, 1200px" /></figure>



<p class="wp-block-paragraph">Input surveys to address various stakeholders like truck drivers, area businesses and residents as well as a plan priorities survey took place in X.</p>



<p class="wp-block-paragraph">A steering committee that represents a broad range of MSCID stakeholder perspectives, including property owners, local governments, freight providers and multiple businesses, oversees the project and serves as champions for the plan process. The three Steering Committee Meetings have already occurred, but you can see the recordings of them here:</p>



<p class="wp-block-paragraph">Steering Committee Meetings</p>



<ul class="wp-block-list">
<li>Meeting 1 (March 2021):&nbsp;<a href="https://youtu.be/LnZ9fCzYcUM">https://youtu.be/LnZ9fCzYcUM</a></li>



<li><a href="https://www.metrosouthcid.org/wp-content/uploads/2021/06/2021.05.04-mscid-steering-committee-meeting-1_final-2.pdf">Steering Committee Meeting 1 Summary</a></li>
</ul>



<ul class="wp-block-list">
<li>Meeting 2 (July 2021):&nbsp;<a href="https://youtu.be/QjyZeeqKzr4">https://youtu.be/QjyZeeqKzr4</a></li>



<li><a href="https://www.metrosouthcid.org/wp-content/uploads/2021/08/2021.07.20-mscid-steering-committee-meeting-2-final-2.pdf">Steering Committee Meeting 2 Summary</a></li>
</ul>



<ul class="wp-block-list">
<li>Meeting 3 (January 2022):&nbsp;<a href="https://youtu.be/spDOn9d0CoI">https://youtu.be/spDOn9d0CoI</a></li>



<li><a href="https://www.metrosouthcid.org/wp-content/uploads/2022/01/mscid-fcp_steering-committee-3_final-pp-presentation.pdf">Steering Committee Meeting 3 PowerPoint</a></li>
</ul>



<p class="wp-block-paragraph">June 3, 2022:&nbsp;Executive Director Larry Kaiser delivered a presentation to the Atlanta Regional Commission.&nbsp;<a href="https://www.dropbox.com/s/u6aoh9fzwxhdp9m/MSCID%20FCP_FATF%2006%2002%202022%20-%20ARC%20presentation.pptx?dl=0"><strong>Click here</strong></a>&nbsp;to view the presentation that provides an overview of the project status, recommended work program and next steps.</p>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="537" src="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Freight-Cluster-Plan-Survey-Input-Graphic-1024x537.jpg" alt="" class="wp-image-385" srcset="https://www.metrosouthcid.org/wp-content/uploads/2022/08/Freight-Cluster-Plan-Survey-Input-Graphic-1024x537.jpg 1024w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Freight-Cluster-Plan-Survey-Input-Graphic-300x157.jpg 300w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Freight-Cluster-Plan-Survey-Input-Graphic-768x403.jpg 768w, https://www.metrosouthcid.org/wp-content/uploads/2022/08/Freight-Cluster-Plan-Survey-Input-Graphic.jpg 1500w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure>



<p class="wp-block-paragraph">Questions should be directed to the project team at <a href="mailto:info@bluecypress-consulting.com">info@bluecypress-consulting.com</a>.</p>



<p class="has-luminous-vivid-amber-background-color has-background wp-block-paragraph">[When this study is over, an overall synopsis of the findings under the introductory paragraph as well as its continued maintenance by DeKalb County and links to its new home would be a good idea.]</p>
<p>The post <a href="https://www.metrosouthcid.org/mscid-freight-cluster-plan/">MSCID Freight Cluster Plan</a> appeared first on <a href="https://www.metrosouthcid.org">Metro South Community Improvement District</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.metrosouthcid.org/mscid-freight-cluster-plan/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
